Photos & CAD Renderings :
Support Frame
Outer Half Cylinder
Assembly Rig rendering
The Romer
The Real Assembly Rig
Prototype cylinder checking out tooling & fixture, 2003
Practice Assembly, 12/03
Features Closeup, 12/03
End Frame Faraday Cage Copper Shielding, 01/04
BSS Assembled, 03/04
Type 1 Module on BSS, 03/04
Time Lines:
Cylinder Schedule 05/27/03 .
Support Frame Schedule 05/26/03.
Assembly Schedule .mpp.
Reports:
BSS Report .PDF
CAD Drawings:
Support Frame (frdd001kR14.dwg).
Inner Cylinder (icdd001e.dwg).
Outer Cylinder (ocdd004e.dwg).
TRT Assembly Jig Proposal (AO-TD-1033-101.dwg).
TRT Assembly Jig Proposal - Assembly Procedure (AO-TD-1033-101-2.dwg).